The project located at Dubai Hills Estate Development, consisting of constructing the "Greenside" Residence for M/s Dubai Hills Estate
Embarking on the esteemed venture of constructing “Greenside” Residence for M/s Emaar Properties. ASIA Prime takes pride in contributing to the vibrant landscape of Dubai Hills Estate.
Spanning across a remarkable built-up area exceeding 78,500 sq.m., and a plot area of 16,450 sq.m. the project will represent the evolving demands of modern living.
Featuring three interconnected blocks on a single plot, the “Greenside” Residence represents elegance and sophistication. Block C (B+G+P) serves as the parking space for the entire project; whereas, Block A above extends from level 1 to 19, while Block B spans from level 1 to 22, offering over 490 units in total, including 1, 2, and 3-bedroom apartments.
With a targeted completion timeline of 912 days, ASIA Prime remains steadfast in delivering the project by 2027.
Construction of Greenside Residence.
M/s Dubai Hills Estate L.L.C.
M/s Al Wasl Al Jadeed Consultants.
M/s MEPCO Electromechanical Works.
Plot No. 6316982 at Dubai Hills Estate, Dubai, U.A.E.
78,500 sq.m.